|
From an idee, to sketches and
from the sketches to the drawing, from drawings to a sales ready product.
 |
-
-
- From
ideas to the products and from
sketches to ready
parts
-
- For
certain ideas, parts or products this is a also a possibility which
we can offer to our customers.
- This
substantially is influenced by our own experience and the experience
of our partners in the area construction, design
and development.
- Unfortunately
again and again the capacity in these fields seems to be much
too small, despite a continuous capacity development at CAO
and all our partners.
-
-
-
-
-
-
- Ask
us, we will inform you with pleasure and in detail, where we have
corresponding experience and where we would be able to offer you an
optimum of performance.
-
-
-
-
-
-
-
-
- Ours
first sample,
shows 5 pictures, sketches and the ready product. The task was, to
develop a new system. It was the CAO
idea
to develop and to replace an available system with problems, related
to the function and manufacturing process, without these weaknesses,
completely new.
-
-
-
-
-
-
-
-
-
-
-
-
-
- Target
A:
- A
absolute new design, essential more favourable cost, because of
saving parts, weight and material. A better and more easy assembling
for users, a much better way for production which leads to a
reduction of errors and reduction of the production cost.
- The
sedate target could completely reached. The amortization of a new
toolkit can be reached, at identical quantity, after 3 months only.
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- Target
B:
-
- Like
A, but under retention of the previous design.
- Our
pictures show the way to the target A, also the new design.
-
|
|

|
 |
 |
 |
|

|
-
- From
ideas to the products and from
sketches to ready
parts
-
- For
certain ideas, parts or products this is a also a possibility which
we can offer to our customers.
- This
substantially is influenced by our own experience and the experience
of our partners in the area construction, design
and development.
- Unfortunately
again and again the capacity in these fields seems to be much
too small, despite a continuous capacity development at CAO
and all our partners.
-
-
-
-
-
-
-
-
-
-
-
- Our
second example,
a completely different product which needs our resources
much stronger, shows a
cordless telephone.
- Telephones
and akin equipment have been a part of our business for many years.
- Here
the idea came from our customer, where we develop telephones and
comparable equipment for many years.
-
-
-
-
- Developing
and designing has been made after a duty exercise book which was
prepared into cooperation between our customer, the end users and
designers here at CAO
-
-
-
-
-
-
-
-
-
-
-
-
- The
main targets, which must be reached:
- Telephone
according DECT standard
-
-
-
- A
functional design which narrowly, however, orientated itself at the
wishes of our customer.
- A
very favourable electronics which, however, must reach all necessary
admittances both in Europe and in the USA.
-
-
- An
economical construction which shows even broader countable advantages
in addition to the cost advantage of the location Shenzhen (China).
-
-
-
-
-
-
-
-
-
-
-
- The
mentioned goals were accomplished after a 12-month development
time.
- 20
prototypes with all drawings and the further necessary production
documents were
- the
result after the first 12 months.
-
-
-
-
-
-
-
-
-
-
-
- We
introduce the results for you into for the pictures A to E here.
-
- Picture
A introduces the circuit boards equipped in the type's hand pattern
-
- The
circuit board in the definite version and the picture B also show C
the picture for the necessary layout
-
- Picture
D (only) shows a part of the developed circuit (wiring)
-
- Picture
E still shows the ready, function and admittance capable telephone
as a test series product
-
-
-
-
|
 |
 |
|

|
 |
-
|